Arabian ranches 1 - Project  in progress in Alvorada 2

Bandeau Alvorada.jpg

Project in arabian ranches 1 - Alvorada 2 in progress ...

Upgraded.

Arabian ranches Project 3 in Alvorada 2.
Before the first cabinet
Before the first cabinet
First cabinet after
First cabinet after
The corridor
The corridor
Before after
Before after
Creation of shoes cabinet for 100 pairs.
Creation of shoes cabinet for 100 pairs.
Sliding doors
Sliding doors
Two pairs of shoes by space
Two pairs of shoes by space
PAinting wall in process
PAinting wall in process
Placement shelves from Bo Concept
Placement shelves from Bo Concept
Living room
Living room
Focus point
Focus point
The dining room
The dining room
Original vases on the wall
Original vases on the wall
Painting doors in process
Painting doors in process
Choice of handles
Choice of handles
In progress in the stairs
In progress in the stairs
Space before the new cabinet
Space before the new cabinet
A integrated cabinet in the wall
A integrated cabinet in the wall
A large storage space won
A large storage space won
The construction
The construction
Custom creation by M2
Custom creation by M2
Amother integration in the wall
Amother integration in the wall
The finishing after installation of the
The finishing after installation of the
New dressing in the wall
New dressing in the wall
Creation of a cabinet only for mister
Creation of a cabinet only for mister
Switch from non-visible to visible
Switch from non-visible to visible